Tuesday, 30 April 2013

8th backdrop project



The 8th and the 9th tee area which is also home to the halfway house it a lovely area that was a little let down by the 8th green backdrop, with the blessing of the greens chairman and secretary we have been given the go ahead to improve the area. Whilst working on the project many members have spoken to us and are pleased with the work being done, some have given us historic information that has proved useful. We are planning a rear screen of laurel shrubs and possibly other colourful shrubs. If any member would like to have input into this project or if you have and plants ect please contact me or any of the grounds staff.

looking better all the time


Area seeded awaiting further developments 


After clearing
Before 

Saturday, 27 April 2013

Summertime??

Growth

It will come honest, summer I mean. As you the golfer get eager to play on smooth and true greens, we the groundsmen of Phoenix are keen to provide such surfaces however mother nature is showing who's the boss.
At phoenix our turfgrass species are a mixed bag namely Poa Annua (annual meadow grass) Lolium Perenne   
(rye grass) over time I would like to gradually change these species to a more sustainable mix with a high Agrostis (bent grass) percentage, but this will take time and resources so for the immediate future we need to continue the improvement program on our greens and the quality and playing characteristics will improve.

Cool season grasses (uk) optimum growth temperature is around 20c as this falls so does growth until the soil temps reach 5c and growth virtually stops. Applied nutrient i.e fertilizer has to be converted into a form that plants can assimilate and its the soil bacteria that does this process called the "nitrogen cycle" below 5c this bacteria is virtually dormant as the temperature rises and the soil fauna kicks into action so does our grasses, meadow grass is very slow on the uptake at cold temperatures to add insult to injury the season is approximately two weeks behind however this situation can change rapidly.

Just look at the winter wheat in the fields, it is said that during march the wheat should be able to hide a hare, as it is now a mouse would have trouble hiding! 

Without soil bacteria plants could not exist, an acre good soil has the same weight as an adult cow in bacteria!!



Thursday, 25 April 2013

11th Drainage Poject








11th area project

The area around the 10th 11th and 12th tee area has severe drainage problems which are becoming worse as the season progresses, the source of this water is from precipitation and possible underground springs that are being hydraulically pressurised by the extremely wet summer of 2012 and the wet winter of 2012/13

On examination of the existing backfilled trenches it was found that the infill materials were of inferior quality which resulted in clay/silt ingress into the slotted pipe, also several old schemes were on top of each other implying continual failed attempts.

The quality of the backfill material is crucial to the success of the new scheme and I recommend a gravel of 2-5mm clean washed material which is none calcareous.

The diagram above is schematic only i.e. there will be eighteen laterals to the left of the open drain.


Key; Green open dyke, Red laterals   

Thursday, 11 April 2013

Greens renovations completed

We have completed the spring renovations and it all went very well, all we need now is some consistently warm temperatures to sustain growth. Next week I will be applying fertilizer to the greens, aprons and tee's this will also help with growth and recovery. Mick and Oz are working their way through the semi rough which is smartening things up and Adi is cross hatching the fairways adding that finishing touch. Mark has been cutting and collecting the tees and working the height of cut down bit by bit and Steve is putting the cherry on the cake by tidying up around the tee's and banking's, well done lads its coming together.

Sunday, 7 April 2013

Greens Renovations update

A nice even application of sand after coring and V cutting




Hopefully tomorrow Monday 8th April 13, we are starting the greens renovations. Mick, Julie or Kimberly
in the pro shop will be updated on a regular basis as to our progression; I will endeavour to have as many Greens fully open as possible some may be closed and some may be on temps which have been cut in preparation. I cannot be more specific because I am not familiar with the outputs of Phoenix equipment and some machines are being used as never before such as the verti-drain which has been adapted to micro-core. If you are playing during renovations and need a chat about what is going on please don’t hesitate to ask I will be happy to explain further.
Photos to be posted as we progress

Sequence of events

  1. Core greens
  2. Clean up cores
  3. V mow if possible
  4. Apply top dressing (sand)
  5. Vibro roll/brush sand into the holes and turf surface
  6. Open green

Aeration/top dressing
Q what is aeration
A aeration is the mechanical means of increasing soil/air ratio
Q why aerate?
A roots grow in the air spaces between soil particles, the ideal ratio of air to soil is 4:1 or 25% air.
Q why do you need to do it again?
A compaction is the Greenkeepers enemy, in order the fight compaction we need to aerate and top dress on a regular basis. The result is a better turf surface that is resilient to drought and water logging, disease/pest attack it will be quicker to drain after rainfall and the turf surface will be thicker and stronger which will produce a firm truer surface and a joy to putt on.


Types of mechanical aeration

Aeration can be categorised into;
  • Deep (verti-draining, slitting, mole ploughing)
  • Shallow (micro-coring, micro-tinning, sarrel rolling)
  • Temporary (slitting, micro-tinning, sarrel rolling)
  • Semi-permanent (verti-draining ,micro-coring, mole ploughing)

Aeration timing
  • Verti-draining; Autumn through Spring
  • Slitting; Autumn through Spring
  • Mole ploughing; Autumn
  • Micro-coring; Spring through Autumn


·       

Sunday, 31 March 2013

STUMP GRINDING & VERTI-DRAINING

On Thursday the 4th April we have a stump grinder coming for a couple of days to deal with the 100+ stumps that we have dotted around the course. The debris will be cleaned up and the resulting holes filled in and seeded ASAP.
Also this week I am hoping to verti-drain the greens with 8 mm tines, please allow the greenkeeper time to remove himself from the green before playing your approach shots, he will move ASAP.

STUMP GRINDING COMPLETED 06/04/13
VERTI-DRAINING ONGOING

Sunday, 24 March 2013

NEW BEGINNINGS

My name is Graham Pickin and I have been appointed as head groundsman of the Phoenix complex on the 4th March 2013 I have inherited a staff of five, I am fortunate to have a broad skill pool within the staff whom are all eager to return Phoenix golf club back to former glory and beyond.It is our personal mission to present the Golf Course and other sporting facilities to the highest standards possible. Although we are all keen to get off the starting block our unseasonal weather just keeps on testing our ability to produce a golf course.
I am personally excited at the potential that Phoenix has, it is a beautiful golf course and has a testing nature. We are now cracking on with the tail end of the winter program and I am already planning for next winter.


Back to the Spring/Summer 

I intend to implement an intense aeration/renovation program to the greens but don't worry my methods are very gentle and don't cause much disruption to your enjoyment or the game of golf. The tees and aprons are to be cut at 10mm or thereabouts and the clippings removed, this will enhance the presentation of the tees and aprons. Because I intend to box off the clippings a fertilizer program has been agreed for the areas mentioned.


The dreaded aeration program

As all seasoned golfers will attest aeration is very important to the quality of turf, particularly on the greens. With this in mind I have posted a video that explains the reasons for aeration.


Ok so now we know what coring is all about the question is when? we have scheduled in coring for approximately 3 days from the 8th April, this is however weather dependent and I will try to only have 3 greens closed at a time.